Choosing road surfacing specialists
Contents |
[edit] Introduction
Roads fulfil a major role in the economy and society by acting as an integral part of the transport system. Roads should be maintained in good condition and need to be resurfaced periodically. Well executed road surfacing is essential for high-volume roads to support the smooth flow of traffic. Motorists are prone to accidents if road surfaces are not in good form.
The road condition should be consistently maintained throughout the length of the road. The surface of a road should have the right level of traction and smoothness, while guarding the under-surface.
[edit] Choosing road surfacing specialists
Keep in mind certain aspects while choosing a surfacing service provider:
[edit] Experience and professionalism
Select a road surfacing contractor who has expertise in the job. Expertise and excellent workmanship come only with experience. There are many contractors who are ready to take up assignments, selecting the one with expertise can make a significant difference in terms of quality. An experienced service provider will display maximum levels of professionalism throughout all phases of the work. A company that has been in the business for a long time is likely to be equipped with the knowledge required.
[edit] Competent staff
Choosing a contractor who provides experienced personnel is really important. They should supply considerate and courteous staff who have been working with the same contractor for a considerable period of time. Experienced staff will be better equipped with proficiency regarding different aspects of the job. Reputable road surfacing contractors provide fully competent and trained labour which forms a part of an all-inclusive package of road services in-house. These companies will invest n the training and development of their staff and work hard to preserve their accreditations.
[edit] Diverse range of skills
Ensure that the selected road surfacing contractor has expertise in a wide range of surfacing services. There are specialists who perform everything from tarmac surfacing to hard landscaping and civil engineering. Their expertise may range from minor tarmac repairs and re-instatements, local authority works to the complete setting up of underground drainage systems.
There are service providers who can deal with a range of assignments such as asphalt surfacing, hard landscaping, roadways, driveways, pathways, footway drop crossings, farm roads, line marking, winter maintenance, block paving etc. These service providers will have a wide-ranging fleet of surfacing plant and equipment allowing them to work on almost any job.
It can also help to analyse the types of clients these providers cater for. Clients might include local governments, local builders, developers, council divisions, health trusts, domestic customers and so on.
[edit] Related articles on Designing Buildings Wiki
- Bituminous mixing and laying plant.
- Britain's historic paving.
- Code of Practice for Ironwork Systems Installation and Refurbishment.
- Deck.
- Glossary of paving terms.
- Gravel v hardcore v aggregates.
- Highway authority.
- Highway drainage.
- NEC contracts - road development and management schemes.
- Overview of the road development process.
- Pavement.
- Road construction.
- Road improvement scheme consultation.
- Road joints.
- Types of road and street.
Featured articles and news
Retrofit 25 – What's Stopping Us?
Exhibition Opens at The Building Centre.
Types of work to existing buildings
A simple circular economy wiki breakdown with further links.
A threat to the creativity that makes London special.
How can digital twins boost profitability within construction?
The smart construction dashboard, as-built data and site changes forming an accurate digital twin.
Unlocking surplus public defence land and more to speed up the delivery of housing.
The Planning and Infrastructure Bill
An outline of the bill with a mix of reactions on potential impacts from IHBC, CIEEM, CIC, ACE and EIC.
Farnborough College Unveils its Half-house for Sustainable Construction Training.
Spring Statement 2025 with reactions from industry
Confirming previously announced funding, and welfare changes amid adjusted growth forecast.
Scottish Government responds to Grenfell report
As fund for unsafe cladding assessments is launched.
CLC and BSR process map for HRB approvals
One of the initial outputs of their weekly BSR meetings.
Architects Academy at an insulation manufacturing facility
Programme of technical engagement for aspiring designers.
Building Safety Levy technical consultation response
Details of the planned levy now due in 2026.
Great British Energy install solar on school and NHS sites
200 schools and 200 NHS sites to get solar systems, as first project of the newly formed government initiative.
600 million for 60,000 more skilled construction workers
Announced by Treasury ahead of the Spring Statement.
The restoration of the novelist’s birthplace in Eastwood.
Life Critical Fire Safety External Wall System LCFS EWS
Breaking down what is meant by this now often used term.
PAC report on the Remediation of Dangerous Cladding
Recommendations on workforce, transparency, support, insurance, funding, fraud and mismanagement.
New towns, expanded settlements and housing delivery
Modular inquiry asks if new towns and expanded settlements are an effective means of delivering housing.